Banner凯发k8国际

News

Energy Storage Weekly 丨 Guangdong Huiyang District is currently under construction and reserves a total of 22 energy storage projects; subsidies of up to 0.3 yuan / KWh!

Oct 24, 2023

Anhui: over 500,000 charging piles to be built by 2027 to meet charging demand of 1 million new energy vehicles

Recently, "Anhui Province high-quality charging and switching service system construction programme (2023-2027)" issued. The programme puts forward, by 2027, the main urban areas strive to form a charging service circle with a radius of no more than 2 km; county and township key areas of charging and switching infrastructure full coverage; highway service area charging and switching infrastructure coverage rate of 100%, the ordinary national and provincial trunk highways and rural highways effective coverage, built the national new energy vehicle charging "inns ""Post"". The province has built no less than 500 power exchange stations and no less than 500,000 charging piles to meet the charging needs of 1 million new energy vehicles. The access rate of public charging piles on the provincial charging and switching infrastructure comprehensive supervision and service platform has reached 100%.

Huizhou District, Guangdong: 4 new energy storage projects completed in 2023 Currently under construction and reserve energy storage projects totalling 22

On 12 October, Huiyang District, Huizhou, Guangdong Province, held a new energy storage industry thematic consultation. According to reports, at present, Huiyang region actually put into production (including trial production) of the new energy storage industry chain related to manufacturing enterprises have 31, including terminal integrated product enterprises 8, 2022, the total output value of the energy storage industry 12.28 billion yuan, an increase of 86.9%.

Energy Storage Bidding丨500MW/1GWh!EPC Bidding for Independent Energy Storage Power Station in Longmen County, Huizhou City, Guangdong Province

On 16 October, Longmen County, Huizhou City, Guangdong Province, 500MW/1000MWh independent energy storage power station EPC bidding, the project capital of 2 billion yuan, the bidder is Longmen Weifa Energy Storage Technology Co.

The project is proposed to be built in Longmen Industrial Park, Longmen City, Huizhou City, Guangdong Province, the project covers a total area of 74,592m², the project adopts the first-tier brands in China, utilising 200 2.5MW/5.0MWh lithium iron phosphate units, adopting a container-type scheme, with the inside of the box containing the battery modules, PCS, BMS, battery control cabinets, etc., and at the same time, constructing a 220KY booster station, and the construction period of the project is 12 months.

Ningbo, Zhejiang: by 2025, the cumulative total of more than 380,000 charging piles, not less than 170,000 in the countryside

On October 13, Ningbo Development and Reform Commission issued "Ningbo Improvement of High-Quality Charging Infrastructure Network System to Promote the Creation of a New Energy Vehicle City Action Plan (2023-2025) (Public Consultation Draft)". The Programme proposes that by 2025, in accordance with the requirements of "someone to build, someone to manage, sustainable", to build a charging infrastructure network system with scientific layout, intelligent and open, fast and slow complementary, safe and convenient, the city has built a total of more than 380,000 charging piles, not less than 170,000 in the countryside, of which more than 30,000 public charging piles have been built, Of these, more than 30,000 public charging piles and no less than 0.6 million piles in villages have been built to meet the charging demand of more than 800,000 new energy vehicles; on the basis of "towns and towns" of charging facilities, "villages and villages" and "roads and roads" will be gradually promoted. The charging infrastructure construction and operation management policy system is basically completed; around the "convenient to charge, convenient to repair, convenient to sell", to build new energy vehicle production, sales, charging, repair, maintenance, recycling of the whole life cycle service system, the annual sales of new energy vehicles to reach 19-20 million (the province's one million) or more, built a new energy vehicle maintenance service outlets 80 The annual sales volume of new energy vehicles will reach more than 19-20 million vehicles (1 million vehicles in the province), and 80 new energy vehicle maintenance service outlets will be built.

Jiangxi: improve time-sharing tariff policy through the market-based approach to achieve sustainable development of new energy storage projects

October 11, Jiangxi Province, the Office of Industry and Information Technology on Zhang Jialiang members of the proposal to make a reply, which mentioned that Jiangxi Province will continue to strengthen lithium and other new energy storage industry cultivation work, increase the sodium-ion batteries, all-vanadium liquid current batteries, such as the introduction of new energy storage enterprises to cultivate efforts. Continue to strengthen the layout of research and development in the field of energy storage, accelerate the realisation of new technologies in the field of new energy, new technology breakthroughs and iteration, and actively promote the construction of Xinyu - Yichun lithium new energy science and technology city.

It is also proposed that the time-sharing tariff policy will be improved to create more space for the development of user-side energy storage projects and source-network-load-storage integration projects. Explore the power supply side and grid side of the new energy storage facilities to participate in the medium and long-term trading, spot and auxiliary services and other power market ways and means, through the market-based approach to achieve sustainable development of the new energy storage project.

National Energy Board Director Liu Deshun: energy storage will focus on these three aspects of work this year

On 10 October, Liu Deshun, Director of Energy Conservation and Science and Technology Equipment Department of the National Energy Board, published a signed article in China Electric Power News, "Leading the high-quality development of energy with scientific and technological innovation". The article mentioned that energy storage, hydrogen energy and other new technologies, new industries is an important support for the planning and construction of a new energy system. Energy storage will focus on three aspects of work this year:

First, to promote the "guiding opinions on accelerating the development of new energy storage", "new energy storage project management specifications (provisional)", "on further promoting the new energy storage to participate in the electricity market and scheduling the use of the notice" and other policy documents on the ground, in-depth research on the policy of the new energy storage, and to promote the relevant departments to introduce the relevant implementation rules.

The second is to co-ordinate the national pilot demonstration work of new types of energy storage, and take the pilot demonstration as a hand to lead the industrialisation development. Make good use of the national new energy storage big data platform, strengthen project tracking and evaluation, summarise the demonstration work in a timely manner, and promote the improvement of the new energy storage policy mechanism.

Third, improve the level of planning and construction and scheduling application, focusing on large-scale wind power photovoltaic base project, promote new energy base power transmission planning configuration of new energy storage technology guidelines for implementation, strengthen the monitoring of the completed project scheduling application, and promote the healthy, orderly and safe development of new energy storage.

Subsidies up to 0.3 yuan / KWh! Dongguan special funds to support the new energy storage!

October 11, Dongguan Development and Reform Bureau issued the "Dongguan City, the new energy storage industry, high-quality development of special funds management approach" and related work guidelines notice, put forward a number of support for the cultivation of the new energy storage industry and the application of the promotion of related policies.

Rewards for the construction of new energy storage innovation carriers:

Key laboratories accredited by national ministries and commissions will be given a one-time reward of RMB 5 million; industrial innovation centres and engineering research centres accredited by national ministries and commissions will be given a one-time reward of RMB 4 million; engineering technology research centres and enterprise technology centres accredited by national ministries and commissions will be given a one-time reward of RMB 3 million. Engineering Research Centre accredited by Guangdong Development and Reform Commission will be given a one-time reward of RMB 2 million; Industrial Innovation Centre accredited by Guangdong Development and Reform Commission will be given a one-time reward of RMB 1 million.

New type of energy storage capital expansion loan subsidy:

For eligible new energy storage capital expansion projects, in the policy validity period to obtain new working capital loans from commercial banking institutions in Dongguan City, upon approval, each project will be subsidised by 30% of the amount of interest calculated at the financial institutions' benchmark interest rate for the current (previous year) loan (excluding penalty interest) (the date of the disbursement needs to be in the previous year, based on the date recorded in the disbursement voucher), and the interest rate will be calculated according to the actual interest rate, if the actual interest rate of the loan is lower than the benchmark interest rate, then the interest rate will be calculated according to the actual interest rate. If the actual interest rate of the loan is lower than the benchmark interest rate, the subsidy will be based on the actual interest rate, and the maximum amount of annual subsidy will not exceed RMB 3 million.